|
Sample Jobs
Cali Photography Studios in Clarks Summit, PA. We engineered & installed the loops, hooked them into the building, flushed and purged them.
We installed the loops,
hooked them into the building, flushed and purged them.
We installed the loops,
hooked them into the building, flushed and purged them.
Dingman Delaware School District This next picture is just a small example of the custom header work that needs to be performed inside each building. The black geothermal pipes in the picture are ready to be fastened to the ceiling. On a finished system, they will carry a water-based fluid from the earth-coupled ground loops into the heat pumps. This installation is a closed loop system and the exact same fluid will be re-circulated for the life of the system.
|
Copyright 2011 J. Karp & Sons |